{"plot": [[0, 0], [2, 0], [4, 0], [6, 0], [8, 0], [10, 0], [12, 0], [14, 2], [16, 3], [18, 4], [20, 0], [22, 1], [24, 0], [26, 9], [28, 47], [30, 54], [32, 115], [34, 54], [36, 75], [38, 19], [40, 13], [42, 6], [44, 69], [46, 12], [48, 7], [50, 10], [52, 7], [54, 1], [56, 1], [58, 1], [60, 0], [62, 0], [64, 0], [66, 0], [68, 0], [70, 1]], "peak": [[32, 115], [36, 75], [44, 69]], "parents":[[3450400],[]], "modified": "2014-06-27", "quote": ["usually, once the construction gets over we install the equipment to prevent the building from a thunder strike. it was nearing completion"], "urls": ["http://dnaindia.com/india/report-2-killed-nine-injured-as-under-construction-building-in-chennai-collapses-1998377", "http://hosted.ap.org/dynamic/stories/A/AS_INDIA_BUILDING_COLLAPSE?SITE=AP&SECTION=HOME&TEMPLATE=DEFAULT"], "frequencies": ["18", "493"], "quotes": ["usually, once the construction gets over we install the equipment to prevent the building from thunder strike. it was nearing completion", "usually, once the construction gets over we install the equipment to prevent the building from a thunder strike. it was nearing completion"], "ids": ["3444819", "3450400"]}